A challenging project? not for J&S Drilling. Firstly we dismantled one of our smaller rigs for the Salt Lake Helicopter Drilling.
Preparation
The maximum lift weight allowed for the project is 1000kg, including rigging, due to the size of the helicopter support. That is to say, we had the ability and equipment, so we dismantled a Jacro 200 into components, tested and weighed to ensure compliance and safety. Subsequently helicopter operations commenced.
Salt Lake Drilling Method
Hollow Auger Core Drilling methodology, depths scoped as nominally 12 meters.
Monitoring Bore Construction
Selected boreholes constructed into monitoring bores using 50mm PVC casing. In conclusion, Brine sampling undertaken to establish the resource potential.
Salt Lake Helicopter Drilling Outcome
Most importantly, KPI’s for the project achieved with no safety related incident recorded and drilling undertaken to the satisfaction of the supervising consultant.
Therefore a job very well done in a remote and very isolated project location.
Location
Salt Lake, Central Western Australia
OUR STANDARDS
Above all, J&S Drilling maintains high standards. So it is most important we are certified in:
AS/NZS 4801:2001 & OHSAS18001:2007 – Occupational Health & Safety Management Systems
ISO 9001:2015 – Quality Management Systems
ISO14001 – Environmental Management Systems
ISO 55001:2014 – Asset Management Systems